--
-
The project for the construction of a waste sorting plant in Orenburg received a positive conclusion from the state examination. It should appear at the EcoSputnik test site.
According to the design documentation, the layout of the waste sorting complex provides for pre-sorting and separation areas. There are also areas for the extraction of ferrous and non-ferrous metals, sorting of waste paper and plastics. MSW sorting control is provided.
The survey site is located on the territory of the existing EcoSputnik test site, it is built up, and a communications complex has been laid there. The work site borders the landfill on the north side.
Tags: project waste sorting plant Orenburg passed state examination