Almost 12 million rubles will be paid for the maintenance of Nizhny Novgorod storm drains in three districts

Almost 12 million rubles will be paid for the maintenance of Nizhny Novgorod storm drains in three districts
Almost 12 million rubles will be paid for the maintenance of Nizhny Novgorod storm drains in three districts
--

In Nizhny Novgorod, they are looking for a contractor who will maintain storm drains in the Avtozavodsky, Kanavinsky and Leninsky districts. The initial price of the contract is 11.6 million rubles. Information is contained on the government procurement portal.

Photo: press service of the Nizhny Novgorod administration

The last date for submitting applications is April 26. The contractor will be selected through an electronic auction.

The contractor will have to clean the coastal strip of the water table, cut down medium-sized bushes, mow lawns, uproot and remove stones from canals and eliminate landfills. The work must be carried out from the date of conclusion of the municipal contract until December 16 of the current year, 2024.

Previously, DOMOSTROYNN.RU reported that the construction of a storm drain in Nizhny Novgorod will begin closer to 2030. Currently, specialists are working on a plan for a unified integrated drainage system in Nizhny Novgorod. It will include data on construction sites and areas where network modernization is required. The document is planned to be prepared by 2026.

Read the most interesting news from the DOMOSTROYRF.RU portal on Telegram and VKontakte.

Author: Valeria Komissarova

Error in text Ctrl + Enter

When using materials, a link to domostroynn.ru is required.

Share:

The article is in Russian

Tags: million rubles paid maintenance Nizhny Novgorod storm drains districts

-

PREV Belgorodenergo company summed up the results of this year’s heating season
NEXT Drones attacked an oil refinery in Ryazan – UNIAN