According to the national project, almost 700 artificial structures will be put into operation in Russia

--

2024-04-26

04/26/2024, 16:28


Anton Rubakhin

According to the national project, almost 700 artificial structures will be put into operation in Russia

By the end of 2024, thanks to the national project “Safe Quality Roads”, almost 700 artificial structures – bridges, overpasses, overpasses – located on the regional and local road network will be put into operation.

It is planned to repair, including major repairs, 49.6 thousand linear lines. m of artificial structures located on the regional and local road network. Build and reconstruct – another 11.3 thousand linear meters. m. The work will take place not only on large facilities, but also on small bridges that play an important role in ensuring transport accessibility for the population.

“The uninterrupted movement of transport on roads is impossible without high-quality and reliable artificial structures. At the same time, the renovation of emergency and pre-emergency bridges and overpasses, especially the construction of new ones, requires significant funding. In 2024, 79 billion rubles are allocated for activities aimed at bringing artificial structures on the regional and local road network to the standards, including 44.3 billion rubles. ― funds from the federal budget,” noted Deputy Head of the Federal Road Agency Igor Kostyuchenko.

Work is underway on major repairs, reconstruction and construction of engineering structures in the Voronezh region.

Thus, within the framework of the national project “Safe Quality Roads”, during the period of its implementation, a bridge over the spillway of the Voronezh reservoir in the regional center, a bridge over the Tikhaya Sosna River in the Ostrogozhsky district at 112 km of the Voronezh-Lugansk highway, a bridge over the Don River in the Ramonsky district were overhauled on the Voronezh Bypass highway; in addition, overpasses on 9 January and Lenin streets were reconstructed in Voronezh.

In addition, the implementation of a large-scale project is currently underway in the regional center under the national project – the reconstruction of the Ostuzhevskaya interchange: an overpass across the railway tracks on Ostuzhev Street, a transport interchange at different levels at the intersection of Ostuzhev and Minskaya streets have already been built, and this year it is planned to begin the construction of an overpass via Leninsky Prospekt.

The article is in Russian

Russia

Tags: national project artificial structures put operation Russia

-

PREV Rybny was awarded the title “City of Labor Glory”
NEXT Comes from childhood. What helped Maria Baeva open souvenir candies for Belgorod residents